Central Coalfields to operate Urimari UG located at Ranchi district in Jharkhand. The proposed rated capacity of the mine is at 0.36 mtpa from a mineable reserves of 3.18 mt. The mined coal is to be transported at Railway Siding at a distance of 3 km.
Central Coalfields to operate Topa-Pindra UG Group of Mines located at Ramgarh district of Jharkhand. The proposed rated capacity of the mine is Topa UGP (0.176 MTPA), Topa RO OCP (1.2 MTPA) and Pindra UGP (0.40 MTPA). It is proposed to extract the balance reserves of 3.59 MT by both UG (SDL) (0.40 MTPA) and OC method (shovel-dumper) (0.50 MTPA) over 322.27 ha.
Central Coalfields to carry out coal block mining at Laiyo mines located at Hazaribagh in Jharkhand. The proposed rated capacity of the mine is at 0.44 mtpa. It may be noted, the mine was closed in 2005. Now, mining would be done underground with y Bord & pillar involving depillaring by caving. The project is located adjoining River Bokaro and Chutua Nal.
Central Coalfields to operate Dhori group of mines located at Bokaro district of Jharkhand. It is to open 3 previously abandoned group 3 contiguous mines Dhori OCP (1 MTPA), new Dhori UGP (0.092 MTPA), and Dhori Khas UGP (0.190 MTPA).
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy